Location: Gilgit
Design Discharge: 74 m3/s
Power: 40 MW
Net Head: 60.4 m
Diversion Weir (height): 19 m
Length of Weir: 198 m
Headrace Tunnel (dia): 6.3 m
Project Cost: 20.5
Location: Dargai, Malakand, KP
Weir/Dam Type: Diversion from Channel
Power Generation: 81 MW
Design Discharge: 51 m3/s
Net Head: 181 m
Length of Power Tunnel: 3.3 km
Annual Energy: 549 GWh
Project Cost: PKR 5.750 billion
Location: Chitral, KP
Weir/Dam Type: Run of the river
Power Generation: 108 MW
Design Discharge: 30 cumec
Gross Head: 436 m
Headrace Tunnel: 3.8 km
Annual Energy: 442 GWh
Project Cost: PKR 29.77 billion
Location: Balakot – Mansehra, KP
Weir/Dam Type: Run-of-the-River
Power Generation: 300 MW
Design Discharge: 154 cumec
Gross Head: 229 m
Tunnel: 9.1 km
Annual Energy: 1143 GWh
Project Cost: PKR 94.5 billion
Location: Jabori Village, Mansehra – KP
Weir/Dam Type: Run-of-the-River
Power Generation: 10.2 MW
Design Discharge: 8 cumec
Gross Head: 148 m
Tunnel: 2.8 km
Annual Energy: 71.1 GWh
Project Cost: PKR 27.86 billion
Location: Karora, Shangla – KP
Weir/Dam Type: Run-of-the-River
Power Generation: 11.8 MW
Design Discharge: 9.75 cumec
Gross Head: 142 m
Tunnel: 2.94 km
Annual Energy: 71.39 GWh
Project Cost: PKR 37.8 billion
Location: Matiltan, Swat, KP
Weir/Dam Type: Run-of-the-River
Power Generation: 84 MW
Design Discharge: 42 cumec
Gross Head: 253 m
Tunnel: 6.67 km
Annual Energy: 346 GWh
Project Cost: PKR 16 billion
Location: Thakot, Kohistan, KP
Weir/Dam Type: RCC
Power Generation: 4814 MW
Design Discharge: 3400 cumec
Gross Head: 159 m
Tunnel: 28 km
Annual Energy: 22180 GWh
Project Cost: USD 7698.34 million