With a team of highly skilled engineers and professionals, we offer a wide range of services including structural design, project management, and on-site execution.
A multi-disciplinary design and engineering consultancy established in 1988 by H.D Bangash, Abdul Ali Khan and Karim Khan, who had the practical knowledge and expertise in Engineering Design and Construction of Dams, Hydropower and Irrigation, Roads, Buildings, Water Supply, Environment & Social, Geotechnical, Geological Fields.
BAK Consulting Engineers is equipped with a team of highly motivated and dynamic professionals, well aware of the project nature and capabilities in providing the resources necessary for the accomplishment of assignments with quality and professionalism. Our team of experts have the knowledge, qualification and expertise for delivering complex projects with high standards.
BAK Construction Engineers delivers customized solutions, including the installation of advanced irrigation systems, maintenance, and repair services.
Our company specializes in offering comprehensive solutions, from site assessment and feasibility studies to detailed engineering design and construction oversight.
From feasibility studies to project management, construction and engineering execution, we ensure seamless integration of hydropower facilities.
From feasibility studies to project management, construction and engineering execution, we ensure seamless integration of hydropower facilities.
Reliable transport solutions contribute to safety compliance and cost management, essential for the success of large-scale engineering endeavors.
These services include project management, procurement, logistics, and maintenance of essential utilities like water, power, and communication systems.
Location: Gilgit
Design Discharge: 74 m3/s
Power: 40 MW
Net Head: 60.4 m
Diversion Weir (height): 19 m
Length of Weir: 198 m
Headrace Tunnel (dia): 6.3 m
Project Cost: 20.5
Location: South Waziristan
Type: Roller Compacted Concrete (RCC) gravity
Dam Height: 133m
Power Generation Capacity: 17.4 MW
Command Area: 163,000 Acres
Length of Main Canal: 60 km
Gross storage capacity: 1.140 MAF
Main Canal: (Design Discharge): 24 cumecs
Project Cost: PKR 25.92 billion
Location: Balakot – Mansehra, KP
Weir/Dam Type: Run-of-the-River
Power Generation: 300 MW
Design Discharge: 154 cumec
Gross Head: 229 m
Tunnel: 9.1 km
Annual Energy: 1143 GWh
Project Cost: PKR 94.5 billion
Location: Chitral, KP
Weir/Dam Type: Run of the river
Power Generation: 108 MW
Design Discharge: 30 cumec
Gross Head: 436 m
Headrace Tunnel: 3.8 km
Annual Energy: 442 GWh
Project Cost: PKR 29.77 billion